  • Application Number: 08/25/00191
  • Parish/Town Council:

Application Progress:

The box that is highlighted in dark green shows how the application is progressing. If the "Comments Welcome By" box is highlighted you can make a comment about the application.

Application Registered:
Comments Welcome By:
03/03/2026
Application Decided:
23/07/2026

Subscription Request Sent :

Error :

Type:
Listed Building Consent - alterations
Location:
Bridgwater Docks, Docks, Bridgwater, Somerset, TA6
Proposal:
Restoration of Bridgwater Dock, including change of use of the dock to introduce residential and leisure moorings and associated infrastructure including new secure entrances and pontoons, creation of an active travel route, removal of the modern newton lock swing bridge and replacement with a new swing bridge, repairs to bascule bridge and associated structures, landscaping and public realm works and engineering works in the basin.
Case Officer:
Amelia Elvé
Registered Date:
20/11/2025
Applicant:
Somerset Council - Regeneration and Major Projects
Applicant Address:
Somerset Council Offices Brympton Way Yeovil United Kingdom BA20 2WG
Agent:
WSP in the UK, Floor 1
Agent Address:
Floor 1 8 First Street Manchester United Kingdom M154RP
Consultation Start Date:
03/07/2026
Earliest Decision Date:
03/03/2026
Committee Date:
14/07/2026
Decision Level:
Committee
Decision:
Granted Permission
Decision Date:
23/07/2026

Conditions and Reasons

Number
Condition
Complied Date
1
The development hereby permitted shall be begun not later than expiration of three years from the date of this permission. Reason: In accordance with the provisions of Section 18 of the Town and Country Planning (Listed Buildings and Buildings in Conservation Areas) Act 1990 (as amended by Section 51 of the Planning and Compulsory Purchase Act 2004).
2
The development hereby permitted shall be carried out in accordance with the approved plans listed in schedule A. Reason: For the avoidance of doubt and in the interests of proper planning.
3
Prior to the commencement of each phase (as detailed in the Phasing Plan to be submitted and approved), a detailed Method Statement shall be submitted to and agreed in writing by the Local Planning Authority. This shall include a full Schedule of Works which comprehensively addresses the repair and retention of any historic fabric, including the iron gears, mooring and bascule bridge. The development shall be carried out in accordance with the approved details. Reason: A pre-commencement condition is required to preserve the listed building, its setting and its features of special architectural interest in accordance with policy D26 of the Sedgemoor Local Plan 2011-2032.
4
Prior to the installation of the interpretation boards, details of their appearance, material finish, scale and location (with relevant details submitted at a scale of 1:5 or 1:10) will be submitted to and approved in writing by the Local Planning Authority. The interpretation boards shall be installed in accordance with the approved details. Reason: To preserve the heritage asset, its setting and its features of special architectural interest as in accordance with policy D26 of the Sedgemoor Local Plan 2011-2032.
5
Prior to the commencement of each phase (as detailed in the Phasing Plan to be submitted and approved), detailed specifications and/or samples of all new materials shall be submitted to and approved in writing by the Local Planning Authority. This should include details of any decorative brick banding and integrated art. Once approved, the development shall be carried out in accordance with the agreed details. Reason: A pre-commencement condition is required in the interest of the visual amenity of the site and to preserve the heritage asset, its setting and its features of special interest as in accordance with policies D2 and D26 of the Sedgemoor Local Plan 2011-2032.
6
Prior to the installation of any new fixtures (including, but not limited to, railings, seating and bollards) details of all such fixtures shall be submitted to and approved in writing by the Local Planning Authority. Once approved, the development shall be carried out in accordance with the agreed details. Reason: In the interest of visual amenity of the site and to preserve the heritage asset, its setting and its features of special interest as in accordance with policies D2 and D26 of the Sedgemoor Local Plan 2011-2032.
7
Prior to the works to install the glazed case for the bascule bridge lifting mechanism, details of the display case, including the intended interpretation, scale, material finish and appearance, including details at a scale of 1:5 or 1:10, shall be submitted to and approved in writing by the Local Planning Authority. Once approved, the development shall be carried out in accordance with the agreed details. Reason: To preserve the heritage asset, its setting and its features of special architectural interest as in accordance with policy D26 of the Sedgemoor Local Plan 2011-2032.
8
Prior to the commencement of works, a Phasing Plan shall be submitted to and approved by the Local Planning Authority. Once approved, the development shall be carried out in accordance with the agreed details. Reason: A pre-commencement condition to secure a satisfactorily correlated order of development.

Copyright Warning

Plans, drawing and material submitted to the council are protected by the copyright acts (Section 47, 1988 Act). You may only use the documents listed below for consultation purposes, to compare current applications with previous schemes and to check whether developments have been completed in accordance with approved plans. Copies must not be made without the prior permission of the copyright owner. By viewing the documents listed below you are accepting this copyright.

Please note: Documents held in our archival system may not meet current accessibility requirements. Many of these documents are exempt from these requirements. See Accessible documents at Somerset Council for further information.

57 Documents Found
Filesize:  748.51 MB
Document Type Description Uri RenditionUri Registered Date File Size Extension
28 Documents Found
Filesize:  58.83 MB
Document Type Description Uri RenditionUri Registered Date File Size Extension
22 Documents Found
Filesize:  23.84 MB
Document Type Description Uri RenditionUri Consultee Registered Date File Size Extension
10 Documents Found
Filesize:  2.86 MB
Document Type Description Uri RenditionUri Registered Date File Size Extension

Please view the Committee Meetings page for Planning North.