Application Details

Click to return to the planning register search page.
  • Application Number: 37/26/00052
  • Parish/Town Council:

Application Progress:

The box that is highlighted in dark green shows how the application is progressing. If the "Comments Welcome By" box is highlighted you can make a comment about the application.

Application Registered:
Comments Welcome By:
15/08/2026
Application Decided:
27/11/2026

Subscription Request Sent :

Error :

Type:
Full Planning Permission
Location:
Bridgwater Gateway Development, Bridgwater Road, North Petherton, Bridgwater, Somerset
Proposal:
Erection of a McDonald's Drive Thru' restaurant and 2No. employment units with associated car parking, circulation, refuse enclosure, landscaping and associated infrastructure.
Case Officer:
Amelia Elvé
Registered Date:
16/07/2026
Applicant:
Bridgwater Gateway Limited
Applicant Address:
c/o agent
Agent:
Angus Meek Architects, Cedar Yard
Agent Address:
Cedar Yard 290a Gloucester Road Bishopston Bristol BS7 8PD
Consultation Start Date:
16/07/2026
Earliest Decision Date:
15/08/2026
Decision Level:
Delegated
Decision:
Granted Permission
Decision Date:
27/11/2026

Conditions and Reasons

Number
Condition
Complied Date
1
The development hereby permitted shall be begun before the expiration of three years from the date of this permission. Reason: In accordance with the provisions of Section 91 of the Town and Country Planning Act, 1990 ( as amended by Section 51 of the Planning and Compulsory Purchase Act 2004).
2
The development hereby permitted shall be carried out in accordance with the approved plans listed in schedule A. Reason: For the avoidance of doubt and in the interests of proper planning.
3
In the event of previously unsuspected contamination being encountered during development works, all works in the affected area should cease immediately and the Local Planning Authority should be notified. A remediation strategy shall then be submitted to and approved in writing by the Local Planning Authority before works recommence in that area. Reason: In the interest of protecting existing residents and future occupiers as in accordance with policies D24 and D25 of the Sedgemoor Local Plan 2011-2032 and policy P2 of the NPPF
4
No part of the development hereby approved shall be occupied until foot/cycle links to Taunton Road and to the pedestrian/cycle path between Carnival Way and Taunton Road, as indicated on the submitted and hereby approved "Landscape Masterplan Drg No. SPP3369 P 90 101 Rev F" has been provided and open for public use in accordance with details agreed in writing by the Local Planning Authority. Reason: To prioritise sustainable transport modes and ensure that safe suitable access to the site is provided for all users in accordance with policy D13 of the Sedgemoor Local Plan 2011-2032 and policy TR4 of the NPPF.
5
No part of the development hereby approved shall be occupied or utilised until the vehicular parking provision and manoeuvring area shown on the submitted and hereby approved "Proposed Site & Ground Floor Plan Drg No. 100 Rev.E" must have been constructed. Thereafter, these areas must be permanently maintained, kept free from obstruction and available for the purposes specified. Reason: To ensure the proper and appropriate parking provision for the site and to ensure that highway safety is not adversely impacted upon as in accordance with policy D14 of the Sedgemoor Local Plan 2011-2032 and policy TR4 of the NPPF.
6
No part of the development hereby approved shall be occupied or utilised until the two sets of secure cycle parking facilities, comprising nine secure stands, as shown on the submitted and hereby approved "Landscape Masterplan Drg No. SPP3369 P 90 101 Rev F" are constructed and available to use. Thereafter, these must be maintained, kept free from obstruction and available for the purposes specified. Reason: To ensure the proper construction of parking facilities and to encourage the use of sustainable transport modes as in accordance with policies D13 and D14 of the Sedgemoor Local Plan 2011-2032 and policy TR4 of the NPPF.
7
No part of the development hereby approved shall be occupied or utilised until a Travel Plan co-ordinator is in place. Thereafter, the Travel Plan shall be implemented in accordance with the submitted and hereby approved "Travel Plan Statement (Pep, May 2026)". Reason: In order to reduce or mitigate the impacts of the development upon the local highway network as in accordance with policies D13 and D14 of the Sedgemoor Local Plan 2011-2032 and policy TR6 of the NPPF
8
The submitted and hereby approved "Soft Planting Plan Drg No. SPP3369 P 92 102 Rev F", "Landscape Masterplan Drg No. SPP3369 P 90 101 Rev F" shall be implemented no later than the end of the first planting season following the first occupation of the development hereby approved. All landscaped areas shall be protected and maintained, and any trees or plants which, within a period of five years from the completion of the planting, die, are removed or become seriously damaged or diseased, shall be replaced in the next planting season with others of a similar size and species. Reason: In the interests of visual amenity and to ensure that development sites are appropriately landscaped to provide enhancement of the environment, mitigation for vegetation that is to be removed, to ensure biodiversity is maintained and that planting schemes are established and managed into the future as in accordance with policies D2, D19 and D20 of the Sedgemoor Local Plan 2011-2032 and policy DP3 of the NPPF.
9
Prior to the commencement of development, a written commitment to the sourcing of local labour shall be submitted to and approved in writing by the local planning authority. The written commitment, as a minimum, shall set out the following matters: i) The proportion of construction works to be sourced from the local labour pool; ii) Work experience/apprenticeship opportunities; iii) The proportion of local procurement and sourcing; iv) On-going skills development and training opportunities; v) The steps that will be taken to ensure that the above is implemented; vi) The operator shall maintain a record of i-v above and shall make that information available to the local planning authority at all reasonable times upon request. Reason: To ensure a commitment to a proportion of local procurement and supplies in the interest of economic prosperity of the area as in accordance with policy D15 of the Sedgemoor Local Plan 2011-2032.
10
No development shall be commenced until details of the sustainable surface water drainage scheme for the site, has been submitted to and approved in writing by the local planning authority. Such scheme should aim to meet the four pillars of SuDS (water quantity, quality, biodiversity, and amenity) to meet wider sustainability aims as specified by The National Planning Policy Framework (August 2026) and the Flood and Water Management Act (2010). The development shall include measures to control and attenuate surface water and once approved the scheme shall be implemented in accordance with the approved details and maintained at all times thereafter unless agreed otherwise in writing by the local planning authority. This shall include, but not limited to: Drawing / plans illustrating the proposed surface water drainage scheme including the sustainable methods employed to delay and control surface water discharged from the site, sewers and manholes, attenuation features, pumping stations (if required) and discharge locations. The current proposals may be treated as a minimum, and further SuDS should be considered as part of a 'SuDS management train' approach to provide resilience within the design. Detailed, network level calculations demonstrating the performance of the proposed system are required and this should include: Details of design criteria etc and where relevant, justification of the approach / events durations used within the calculations. Calculations should use the most up to date rainfall and climate change data. Where relevant, calculations should consider the use of surcharged outfall conditions. Performance of the network including water level, surcharged depth, flooded volume, pipe flow, flow/overflow capacity, status of network and outfall details / discharge rates. Results should be provided as a summary for each return period (as opposed to each individual storm event). Evidence may take the form of software simulation results and should be supported by a suitably labelled plan/schematic to allow cross checking between any calculations and the proposed network Detail drawings, including cross sections, of proposed features such as infiltration structures, attenuation features, pumping stations and outfall structures. These should be feature-specific, include structural details and the risk of failure and exceedance. Results of infiltration testing to BRE standards demonstrating viability of infiltration features where these are located. Results of groundwater monitoring should also be provided to infiltration features will not be impacted and are designed appropriately. Further information regarding external levels and surface water exceedance routes and how these will be directed through the development without exposing properties to flood risk. Further investigation into the receiving system, including route, condition and capacity to ensure that this is able to take flows and volume from the site. Details of any remedial works identified as necessary to ensure appropriate condition of the receiving system should also be provided. Reason: To ensure the development is properly drained in accordance with policy F8 of the NPPF and policy D1 of the Sedgemoor Local Plan 2011-2032.
11
No development approved by this permission shall be occupied or brought into use until a plan for the future responsibility and maintenance of the surface water drainage system and any watercourses under riparian ownership of the site, has been submitted to and approved by the Local Planning Authority. The approved drainage works shall be completed and maintained in accordance with the details agreed. Reason: To safeguard the long-term maintenance and operation of the proposed system to ensure development is properly drained in accordance with policy F8 of the NPPF and policy D1 of the Sedgemoor Local Plan 2011-2032.
12
The surface water drainage scheme, including attenuation, flow control and outfall shall be fully implemented in accordance with the approved details prior to the commencement of development except for highway works. This shall include a Construction Surface Water Management Plan, which shall set out how surface water runoff will be managed throughout the construction phase including measures to control both the quantity and quality of runoff, so as to prevent unrestricted discharge and pollution to any receptor. Post construction the drainage system shall be inspected, fully cleared and any necessary remediation works undertaken. Reason: To ensure the effective management of surface water during both construction and operation of the development in the interests of flood risk, water quality, and sustainable drainage, in accordance with policy F8 of the NPPF and policy D1 of the Sedgemoor Local Plan 2011-2032.
13
No development shall take place (including demolition, ground works, vegetation clearance) until a construction environmental management plan (CEMP: Biodiversity) has been submitted to and approved in writing by the Local Planning Authority. The CEMP (Biodiversity) shall include the following: a. Risk assessment of potentially damaging construction activities. b. Identification of "biodiversity protection zones". c. Practical measures (both physical measures and sensitive working practices) to avoid or reduce impacts to habitats and species. d. The location and timing of sensitive works to avoid harm to biodiversity features. e. The times during construction when specialist ecologists need to be present on site to oversee works. f. Responsible persons, lines of communication and written notifications of operations to the Local Planning Authority. g. The role and responsibilities on site of an ecological clerk of works (ECoW) or similarly competent person. h. Use of protective fences, exclusion barriers and warning signs. i. Ongoing monitoring, including compliance checks by a competent person(s) during construction and immediately post-completion of construction works. The approved CEMP shall be adhered to and implemented throughout the construction period strictly in accordance with the approved details, unless otherwise agreed in writing by the Local Planning Authority. Reason: A pre-commencement condition to avoid adverse impacts on habitats and species during construction, and to conserve and enhance biodiversity in accordance with policy N2 of the NPPF and policy D20 of the Sedgemoor Local Plan 2011-2032.
14
Prior to the installation of any external lighting, a lighting design for bats and other light-sensitive species, following Guidance Note 08/23 Bats and Artificial Lighting at Night (ILP and BCT, 2023), or any subsequent update or replacement guidance recognised as best practice within the industry at the time of submission, shall be submitted to and approved in writing by the Local Planning Authority. The design shall show how and where external lighting will be installed. All external lighting shall be installed in accordance with the approved specifications and locations and maintained thereafter in accordance with the approved design. Under no circumstances shall any other external lighting be installed without the prior written approval of the Local Planning Authority. Reason: To conserve and enhance biodiversity, maintain dark corridors and avoid adverse effects on bats and other light-sensitive species in accordance with policy N2 of the NPPF and policy D20 of the Sedgemoor Local Plan 2011-2032.
15
No development above slab level shall commence until a Habitat Management and Monitoring Plan (HMMP) has been submitted to and approved in writing by the Local Planning Authority. The HMMP shall be prepared by a suitably qualified ecologist and shall include: a. Details of the onsite habitats and biodiversity enhancements to be created in accordance with the approved Biodiversity Gain Plan; b. Habitat establishment and aftercare measures for grassland, hedgerow and tree planting; c. Management prescriptions necessary to maintain the approved habitat types and target conditions; d. The person(s) responsible for implementation and ongoing management; e. A monitoring schedule for the first five years following habitat creation, including remedial measures where habitat establishment is unsuccessful. The approved HMMP shall be implemented in full and all habitats shall thereafter be managed in accordance with the approved details. Reason: A pre-commencement condition to secure biodiversity enhancement measures and support nature recovery in accordance with policy N2 of the NPPF and policy D20 of the Sedgemoor Local Plan 2011-2032.
16
The Biodiversity Gain Plan to be submitted to the Local Planning Authority in accordance with Paragraphs 13 and 14 of Part 2 of Schedule 7A of the Town and Country Planning Act 1990 shall be broadly in accordance with the approved Biodiversity Net Gain Statement and Assessment (GE Consulting Services Ltd., Version 2) and Statutory Biodiversity Metric Version 2. Reason: To ensure that the strategy for meeting the Biodiversity Net Gain requirements for the development does not change significantly following the grant of planning permission and to minimise the risk of significant post-permission viability issues arising due to Biodiversity Net Gain issues.
17
The two employment units hereby approved shall be used for purposes falling within Use Classes E(g) and B8 and for no other purpose including any other purpose in Class E of the Schedule to the Town and County Planning (Use Classes) Order 1987 (as amended). Reason: To ensure the economic viability of the committed employment site as in accordance with policies B7 and D15 of the Sedgemoor Local Plan 2011-2032.
18
Prior to the first occupation of the development hereby approved, the sustainability measures detailed in the submitted and hereby approved "Energy & Sustainability Statement" (Method Consulting, June 2026) shall be installed. Once installed, the measures shall be retained and maintained thereafter in perpetuity. Reason: In the interest of meeting sustainability objectives as in accordance with policy S5 of the Sedgemoor Local Plan 2011-2032 and policy CC2 of the NPPF.
19
Prior to the commencement of development, a Site Waste Management Plan, detailing measures for construction and occupation phases of the development, informed by the submitted and hereby approved "Design, Access & Planning Statement" (Angus Meek Architects, June 2026) shall be submitted to the Local Planning Authority. The details within the submitted Site Waste Management Plan shall be implemented in accordance with the approved measures. Reason: In the interest of ensuring that the site is adequately served by an appropriate site waste management provision during all phases of the development as in accordance with policy WCS2 of the Somerset Waste Core Strategy 2028.
20
Informative No Development shall commence until:  (a) a Biodiversity Gain Plan has been submitted to the planning authority, and  (b) the planning authority has approved the plan.  The development shall then be carried out in accordance with the agreed details.  Reason: This condition is pre commencement to ensure that the strategy for meeting the Biodiversity Net Gain is in accordance with paragraph 13 of Schedule 7A to the Town and Country Planning Act 1990 to minimise the risk of significant post-permission viability issues arising due to Biodiversity Net Gain issues.

Copyright Warning

Plans, drawing and material submitted to the council are protected by the copyright acts (Section 47, 1988 Act). You may only use the documents listed below for consultation purposes, to compare current applications with previous schemes and to check whether developments have been completed in accordance with approved plans. Copies must not be made without the prior permission of the copyright owner. By viewing the documents listed below you are accepting this copyright.

Please note: Documents held in our archival system may not meet current accessibility requirements. Many of these documents are exempt from these requirements. See Accessible documents at Somerset Council for further information.

27 Documents Found
Filesize:  179.1 MB
Document Type Description Uri RenditionUri Registered Date File Size Extension
20 Documents Found
Filesize:  23.46 MB
Document Type Description Uri RenditionUri Registered Date File Size Extension
17 Documents Found
Filesize:  1.22 MB
Document Type Description Uri RenditionUri Consultee Registered Date File Size Extension
2 Documents Found
Filesize:  57 kb
Document Type Description Uri RenditionUri Registered Date File Size Extension
2 Documents Found
Filesize:  366 kb
Document Type Description Uri RenditionUri Registered Date File Size Extension

Please note: Documents held in our archival system may not meet current accessibility requirements. Many of these documents are exempt from these requirements. See Accessible documents at Somerset Council for further information.

No Committee documents found.