  • Application Number: 37/25/00034
  • Parish/Town Council: North Petherton

Application Progress:

The box that is highlighted in dark green shows how the application is progressing. If the "Comments Welcome By" box is highlighted you can make a comment about the application.

Application Registered:
Comments Welcome By:
05/09/2025
Application Decided:
20/03/2026

Subscription Request Sent :

Error :

Type:
Full Planning Permission
Location:
Bridgwater Gateway Development, Bridgwater Road, North Petherton, Bridgwater, Somerset
Proposal:
Erection of 4no. employment units (mix of Use Classes E(g) and B8) with associated car parking including EV charging, circulation, landscaping and associated infrastructure, on plots 1611, 1612, 1614 & 1615.
Case Officer:
Amelia Elvé
Registered Date:
13/06/2025
Applicant:
Bridgwater Gateway Industrial Ltd
Applicant Address:
c/o Agent
Agent:
Angus Meek Architects, Cedar Yard
Agent Address:
Cedar Yard 290a Gloucester Road Bishopston Bristol BS7 8PD
Consultation Start Date:
14/08/2025
Earliest Decision Date:
05/09/2025
Decision Level:
Delegated
Decision:
Granted Permission
Decision Date:
20/03/2026

Conditions and Reasons

Number
Condition
Complied Date
1
The development hereby permitted shall be begun before the expiration of three years from the date of this permission. Reason: In accordance with the provisions of Section 91 of the Town and Country Planning Act, 1990 ( as amended by Section 51 of the Planning and Compulsory Purchase Act 2004).
2
The development hereby permitted shall be carried out in accordance with the approved plans listed in schedule A. Reason: For the avoidance of doubt and in the interests of proper planning.
3
The development permitted by this planning permission shall only be carried out in accordance with the drainage strategy report dated May 2025 from Airey and Coles Consulting Engineering (ref 11609-A&C-1600-XXDS- C-00010) and the following mitigation measures detailed within the document: 1. Limiting the surface water run-off generated by all rainfall critical storm up to, and including, the 1 in 100 year plus climate change so that it will not exceed the run-off from the undeveloped site and not increase the risk of flooding off-site. 2. Provision of surface water attenuation pond on site to attenuate the runoff from the site to 3.7 l/s from impermeable area. Reason: To prevent flooding by ensuring the satisfactory storage of/disposal of surface water from the site and to prevent flooding elsewhere by ensuring restriction of surface water from the site as in accordance with policy D1 of the Sedgemoor Local Plan 2011-2032.
4
The Biodiversity Gain Plan to be submitted to the Local Planning Authority in accordance with Paragraphs 13 and 14 of Part 2 of Schedule 7A of the Town and Country Planning Act 1990 shall be broadly in accordance with the approved Biodiversity Gain Statement [GE Consulting/13th May 2025]. Reason: To ensure that the strategy for meeting the Biodiversity Net Gain requirements for the development does not change significantly following the grant of planning permission and to minimise the risk of significant post-permission viability issues arising due to Biodiversity Net Gain issues
03/07/2026
5
No development shall take place (including demolition, ground works, vegetation clearance) until a construction environmental management plan (CEMP: Biodiversity) has been submitted to and approved in writing by the Local Planning Authority. The CEMP (Biodiversity) shall include the following: a) Risk assessment of potentially damaging construction activities. b) Identification of "biodiversity protection zones". c) Practical measures (both physical measures and sensitive working practices) to avoid or reduce impacts during construction (may be provided as a set of method statements), including nesting birds habitat clearance measures, badgers buffer zones etc. d) The location and timing of sensitive works to avoid harm to biodiversity features. e) The times during construction when specialist ecologists need to be present on site to oversee works. f) Responsible persons, lines of communication and written notifications of operations to the Local Planning Authority g) The role and responsibilities on site of an ecological clerk of works (ECoW) or similarly competent person (including regular compliance site meetings with the Council Biodiversity Officer and Landscape Officer (frequency to be agreed, for example, every 3 months during construction phases)) h) Use of protective fences, exclusion barriers and warning signs. i) Ongoing monitoring, including compliance checks by a competent person(s) during construction and immediately post-completion of construction works j) Evidence (written statement and or photos) of meetings, toolbox talks, protection measures etc will be required upon completion of works ; The approved CEMP shall be adhered to and implemented throughout the construction period strictly in accordance with the approved details, unless otherwise agreed in writing by the Local Planning Authority. Once approved, the development shall be carried out in accordance with the approved details. Reason: In the interests of European and UK protected species. UK priority species and habitats listed on s41 of the Natural Environment and Rural Communities Act 2006 and in accordance with policy D20 of the Sedgemoor Local Plan 2011-2032.
03/07/2026
6
A Landscape and Ecological Management Plan (LEMP) shall be submitted to, and be approved in writing by, the Local Planning Authority prior to the first occupation of the development hereby approved. The content of the LEMP shall include the following: a) Description and evaluation of features to be managed. b) Ecological trends and constraints on site that might influence management. c) Aims and objectives of management. d) Appropriate management options for achieving aims and objectives. e) Prescriptions for management actions. f) Preparation of a work schedule (including an annual work plan capable of being rolled forward over a five-year period). g) Details of the body or organization responsible for implementation of the plan. h) On-going monitoring and remedial measures. i) Evidence (written statement and or photos) of meetings, toolbox talks, protection measures etc will be required upon completion of works; The LEMP shall also include details of the legal and funding mechanism(s) by which the long-term implementation of the plan will be secured by the developer with the management body(ies) responsible for its delivery. The plan shall also set out (where the results from monitoring show that conservation aims and objectives of the LEMP are not being met) how contingencies and/or remedial action will be identified, agreed and implemented so that the development still delivers the fully functioning biodiversity objectives of the originally approved scheme. The approved plan will be implemented in accordance with the approved details. Reason: In the interests of the 'Favourable Conservation Status' of populations of European and UK protected species, UK priority species and habitats listed on s41 of the Natural Environment and Rural Communities Act 2006 and in accordance with Sedgemoor District Council Local Plan: Policy D20 - Biodiversity and Geodiversity
03/07/2026
7
No development approved by this permission shall be occupied or brought into use until a plan for the future responsibility and maintenance of the surface water drainage system has been submitted to and approved by the Local Planning Authority. The approved drainage works shall be completed prior to the occupation of the development hereby approved and maintained in accordance with the details agreed. Reason: To safeguard the long-term maintenance and operation of the proposed system to ensure development is properly drained in accordance with the NPPF and policy D1 of the Sedgemoor Local Plan 2011-2032.
03/08/2026
8
Prior to the commencement of development, a construction stage surface water management plan shall be submitted to and approved by the Local Planning Authority, with the approved details constructed and fully implemented prior to the commencement of development except for highway works. This shall include details to demonstrate that surface water will be managed during the construction phase to prevent unrestricted discharge and pollution to any receiving system. Post construction the drainage system shall be inspected, fully cleared and any remediation works undertaken. Reason: A pre-commencement condition to ensure that the development can be served by a suitable drainage system as in accordance with policy D1 of the Sedgemoor Local Plan 2011-2032.
01/09/2026
9
All the recommendations of the submitted and hereby approved Measures Only Travel Plans for each of the four units shall be implemented, implementation monitored, and reviewed in accordance with the timetable therein. Thereafter the development shall operate the submitted and hereby appproved Measures Only Travel Plan or any variation of the Travel Plan to the satisfaction of Local Planning Authority for the Duration, unless agreed in writing by the Local Planning Authority. Reason: As in accordance with policy D14 of the Sedgemoor Local Plan 2011-2032.
10
The development hereby approved shall be used for purposes falling within Use Classes E(g) and B8 and for no other purpose including any other purpose in Class E of the Schedule to the Town and County Planning (Use Classes) Order 1987 (as amended). Reason: To ensure the economic viability of the committed employment site as in accordance with policies B7 and D15 of the Sedgemoor Local Plan 2011-2032.
11
Before the development is occupied or utilised the electric vehicle charging points and parking bays shown on the submitted and hereby approved plans must have been constructed. Thereafter, they must be maintained, kept free from obstruction and available for the purposes specified in perpetuity. Reason: In the interest of highways safety as in accordance with policy D14 of the Sedgemoor Local Plan 2011-2032.
12
The areas allocated for vehicle parking, loading and unloading, and turning on the submitted and approved plans, shall be kept clear of obstruction and shall only be used for the said purpose and not for any other purposes. Reason: In the interest of highways safety as in accordance with policy D14 of the Sedgemoor Local Plan 2011-2032.
13
Prior to the first occupation of each unit hereby approved, a Service Delivery Plan shall be submitted to and approved by the Local Planning Authority. The Service Delivery Plan shall set out how deliveries to and servicing of the relevant unit are arranged to minimise the impact on the amenity and operation of highways and transport infrastructure, and should, therefore, include at least the following details: - Measures to ensure deliveries do not overlap unless unavoidable circumstances alter this - Hours of loading and unloading - The frequency and size of vehicles - Consolidation of deliveries The approved Service Delivery Plan shall be adhered to and implemented through the occupation of the development herby approved, strictly in accordance with the approved details, unless otherwise agreed in writing by the Local Planning Authority. Reason: In the interest of highways safety as in accordance with policy D14 of the Sedgemoor Local Plan 2011-2032.
14
The submitted and hereby approved planting scheme (as shown by Landscape Planting Plan Drg No. PP3395 92 002 Rev C and Landscape Masterplan Drg No. SPP3395 P90 001 Rev C) shall be implemented in the first planting season following the completion of the development or otherwise agreed. All landscape areas shall be protected and maintained, and any trees or plants which, within a period of five years from the completion of the planting, die, are removed or become seriously damaged or diseased, shall be replaced in the next planting season with others of a similar size and species unless the LPA has given written consent to any variation. Reason: To ensure that development sites are appropriately landscaped to provide enhancement of the environment, mitigation for vegetation that is to be removed, to ensure biodiversity is maintained and that planting schemes are established and managed into the future and in the interest of visual amenity as in accordance with policy D2 of the Sedgemoor Local Plan 2011-2032.
15
The Habitat Management and Monitoring Plan (HMMP) shall be submitted to, and be approved in writing by, the Local Planning Authority prior to the commencement of the development. The content of the HMMP shall include details of how the habitat being created for BNG will be managed for 30 years, as well as the following details: 1. Description and evaluation of features to be created and managed including the habitats within the HEP calculation 2. Ecological trends and constraints on site that might influence management. 3. Aims and objectives of management. 4. Appropriate management options for achieving aims and objectives. 5. Prescriptions for management actions including planting specifications. 6. Preparation of a work schedule with contingency to adapt habitat management if necessary. 7. Details of the body or organization responsible for implementation of the plan. 8. On-going monitoring and remedial measures to ensure that habitats are managed appropriately. The approved plan will be implemented in accordance with the approved details. Reason: A pre-commencement condition to ensure that the strategy for meeting the Biodiversity Net Gain requirements for the development does not change significantly following the grant of planning permission and to minimise the risk of significant post-permission viability issues arising due to Biodiversity Net Gain issues.
03/07/2026

Copyright Warning

Plans, drawing and material submitted to the council are protected by the copyright acts (Section 47, 1988 Act). You may only use the documents listed below for consultation purposes, to compare current applications with previous schemes and to check whether developments have been completed in accordance with approved plans. Copies must not be made without the prior permission of the copyright owner. By viewing the documents listed below you are accepting this copyright.

Please note: Documents held in our archival system may not meet current accessibility requirements. Many of these documents are exempt from these requirements. See Accessible documents at Somerset Council for further information.

26 Documents Found
Filesize:  240.98 MB
Document Type Description Uri RenditionUri Registered Date File Size Extension
30 Documents Found
Filesize:  32.4 MB
Document Type Description Uri RenditionUri Registered Date File Size Extension
23 Documents Found
Filesize:  26.82 MB
Document Type Description Uri RenditionUri Consultee Registered Date File Size Extension
4 Documents Found
Filesize:  35.53 MB
Document Type Description Uri RenditionUri Registered Date File Size Extension
21 Documents Found
Document Type Description Uri RenditionUri Registered Date File Size Extension

Please note: Documents held in our archival system may not meet current accessibility requirements. Many of these documents are exempt from these requirements. See Accessible documents at Somerset Council for further information.

No Committee documents found.