Application Details

Click to return to the planning register search page.
  • Application Number: 09/24/00019
  • Parish/Town Council: Bridgwater Without

Application Progress:

The box that is highlighted in dark green shows how the application is progressing. If the "Comments Welcome By" box is highlighted you can make a comment about the application.

Application Registered:
Comments Welcome By:
01/10/2025
Application Decided:
10/03/2026

Subscription Request Sent :

Error :

Type:
Full Planning Permission
Location:
Land to the West of, Bristol Road, Dunball, Bridgwater, Somerset, TA6
Proposal:
Erection of 2no. buildings (Class B2/B8) and all associated works.
Case Officer:
Graham Northern
Registered Date:
09/01/2025
Applicant:
Roselea Properties Ltd
Applicant Address:
c/o Agent c/o Agent c/o Agent B2 5TB
Agent:
CarneySweeney, 3rd Floor Waterloo House
Agent Address:
3rd Floor Waterloo House Waterloo Street Birmingham B2 5TB
Consultation Start Date:
16/09/2025
Earliest Decision Date:
01/10/2025
Decision Level:
Delegated
Decision:
Granted Permission
Decision Date:
10/03/2026

Conditions and Reasons

Number
Condition
Complied Date
1
The development hereby permitted shall be begun before the expiration of three years from the date of this permission. Reason: In accordance with the provisions of Section 91 of the Town and Country Planning Act, 1990 ( as amended by Section 51 of the Planning and Compulsory Purchase Act 2004).
2
The development hereby permitted shall be carried out in accordance with the approved plans listed in schedule A. Reason: For the avoidance of doubt and in the interests of proper planning.
3
No development above damp proof course shall be commenced until details of the sustainable surface water drainage scheme for the site, has been submitted to and approved in writing by the local planning authority. Such scheme should aim to meet the four pillars of SuDS (water quantity, quality, biodiversity, and amenity) to meet wider sustainability aims as specified by The National Planning Policy Framework (2024) and the Flood and Water Management Act (2010). The development shall include measures to control and attenuate surface water and calculations should be provided using the most up to date rainfall data. Once approved the scheme shall be implemented in accordance with the approved details and maintained at all times thereafter unless agreed otherwise in writing by the local planning authority. Reason: To ensure the development is properly drained in accordance with the NPPF.
30/09/2026
4
No development approved by this permission shall be occupied or brought into use until a plan for the future responsibility and maintenance of the surface water drainage system has been submitted to and approved by the Local Planning Authority. The approved drainage works shall be completed and maintained in accordance with the details agreed. Reason: To safeguard the long-term maintenance and operation of the proposed system to ensure development is properly drained in accordance with the NPPF.
30/09/2026
5
Prior to the buildings first use plans showing the parking and turning areas catering for all vehicles reasonably associated with the site/development and electric vehicle charging shall be submitted to and approved in writing by the Local Planning Authority. Such facilities shall be provided, marked out and consolidated prior to first occupation and maintained thereafter specifically for vehicles in connection with the development hereby permitted. Reason: To ensure the development provides suitable parking provision in accordance with Sedgemoor Local Plan policies D13 and D14.
6
The development hereby permitted must not be occupied or utilised until a scheme showing precise details of the proposed cycle parking facilities is submitted to the Local Planning Authority and approved in writing. Once approved, any such scheme must be constructed before the development is occupied and, thereafter, must be maintained, kept free from obstruction and available for the purpose specified. Reason: To ensure that the development provides suitable, secure and accessible cycle parking that supports and encourages sustainable travel choices, in accordance with Sedgemoor Local Plan Policy D13 (Sustainable Transport and Movement).
7
Prior to the commencement of the use, a measures only Travel Statement is to be submitted to and approved in writing by the Local Planning Authority. The statement shall include soft and hard measures to promote sustainable travel and a timetable for implementation. The development shall not be occupied unless the agreed measures are being implemented in accordance with the approved timetable. The measures shall continue to be implemented for the duration of the development. Reason: To promote sustainable travel behaviour, reduce dependence on private car use, and minimise transport impacts in accordance with Sedgemoor Local Plan Policies D13 (Sustainable Transport and Movement) and D14 (Managing the Transport Impacts of Development).
8
Provision shall be made within the site for the disposal of surface water so as to prevent its discharge onto the highway, details of which shall have been submitted to and approved in writing by the Local Planning Authority. Such provision shall be installed prior to development above damp-proof course level and thereafter maintained in perpetuity. NOTE: Any systems provided for the purposes of draining the site shall be constructed and maintained privately. At no point will this Authority accept private infrastructure being connected into highway drainage systems. Reason: To ensure the development incorporates appropriate surface water management measures, prevents increased flood risk, and complies with Sedgemoor Local Plan Policy D1 (Flood Risk and Surface Water Management)
11/09/2026
9
No development shall take place, including any demolition works, until a Construction Management Plan or Construction Method Statement has been submitted to and approved in writing by the Local Planning Authority. The approved plan/statement shall be adhered to throughout the demolition and construction period and shall include: 24hour emergency contact number Hours of operation Parking for site operatives and visitors, including measures to maintain access for neighbouring occupiers Routes for construction traffic Locations for loading/unloading and storage of plant, waste and construction materials Method of preventing mud being carried onto the highway Measures to protect vulnerable road users Any necessary temporary traffic management Arrangements for turning vehicles Arrangements to receive abnormal loads or unusually large vehicles Methods of communicating the Plan to staff, visitors, neighbours, and local businesses Reason: To minimise the impact of construction traffic, safeguard highway safety, and ensure the development manages transport impacts appropriately, in accordance with Sedgemoor Local Plan Policy D14 (Managing the Transport Impacts of Development).
10
Should any of the commercial buildings (Units) be altered or subdivided from the originally approved layout, each altered or subdivided area shall incorporate an internal mezzanine floor designed and provided as a safe refuge. The mezzanine level shall be constructed before the altered or subdivided unit is first brought into use and shall remain in situ, unobstructed, and available for refuge purposes for the lifetime of the development. Reason: In the interests of ensuring safe refuge for occupants in the event of a flood emergency and to maintain long-term resilience of the development.
11
Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) (England) Order 2015 or any order revoking and re-enacting that order with or without modification, no structure shall be erected within 10 metres from the toe of the flood defence bank, down the landward side without written permission of the local planning authority in consultation with the Environment Agency (or any successor organisation). Reason: To ensure the structural integrity of the flood defences is not impacted and operational access is maintained in the interests of flood risk management.
12
The external building materials shall be as specified in the application on the approved drawings unless otherwise agreed in writing. Reason: To ensure suitability of designa nd visual amenity ina ccordance with policy D2 of the Local Plan
13
The building/s hereby permitted shall be used only for purposes within Use Classes B2 (General Industrial) and B8 (Storage and Distribution) of the Schedule to the Town and Country Planning (Use Classes) Order 1987 (as amended), and for no other purpose, including any purpose within Class E(g) or any other use class, or any permitted change allowed under the Town and Country Planning (General Permitted Development) (England) Order 2015 (as amended), unless otherwise agreed in writing by the Local Planning Authority. Reason: To ensure that the development is used only for the purposes applied for, to protect the operation of the wider business park, and to safeguard the local highway network and amenity in accordance with Policies S2 and D15 of the Local Plan.
14
No development approved by this permission shall be commenced until a Construction Environmental Management Plan, incorporating pollution prevention measures, has been submitted to and approved in writing by the Local Planning Authority. The plan shall subsequently be implemented in accordance with the approved details and agreed timetable. Reason: To prevent pollution of the water environment in line with paragraph 187 of the National Planning Policy Framework.
15
All ecological measures and/or works shall be carried out in accordance with the details contained in section 4 and 5 of the Preliminary Ecological Appraisal Report (Swan Environmental Ltd, October 2024) as already submitted with the planning application and agreed in principle with the Local Planning Authority prior to determination; to include: Avoidance measures during the construction phase to protect habitats of importance and nearby designated sites A nesting bird check if any trees or buildings are to be removed within the nesting bird season, including checks for ground nesting birds. (March September inclusive). Reasonable avoidance measures for reptiles, common amphibians, bats, badgers and hedgehog. A report prepared by the Ecological Clerk of Works or similarly competent person certifying that the required mitigation and compensation measures identified in the PEA have been completed to their satisfaction, and detailing the results of site supervision and any necessary remedial works undertaken or required, shall be submitted to the Local Planning Authority for approval. Any approved remedial works shall subsequently be carried out under the strict supervision of a professional ecologist following that approval. Reason: In the interests of the 'Favourable Conservation Status' of populations of European and UK protected species, UK priority species and habitats listed on s41 of the Natural Environment and Rural Communities Act 2006 and in accordance with Sedgemoor District Council Local Plan: Policy D20 - Biodiversity and Geodiversity.
16
If/where external lighting is to be installed, prior to the installation of any external lighting, a lighting design for bats and other light sensitive species, following Guidance Note 08/23 - bats and artificial lighting at night (ILP and BCT 2023), or any subsequent update or replacement guidance recognised as best practice within the industry at the time of submission of the design, shall be submitted to and approved in writing by the Local Planning Authority. The design shall show how and where external lighting will be installed. All external lighting shall be installed in accordance with the specifications and locations set out in the design, and these shall be maintained thereafter in accordance with the design. Under no circumstances should any other external lighting be installed without prior consent from the Local Planning Authority. Reason: In the interests of the 'Favourable Conservation Status' of populations of European and UK protected species, UK priority species and habitats listed on s41 of the Natural Environment and Rural Communities Act 2006 and in accordance with Sedgemoor District Council Local Plan: Policy D20 - Biodiversity and Geodiversity.
17
BNG Informative: No Development shall commence until: (a) a Biodiversity Gain Plan has been submitted to the planning authority, and (b) the planning authority has approved the plan. The development shall then be carried out in accordance with the agreed details. Reason: This condition is pre commencement to ensure that the strategy for meeting the Biodiversity Net Gain is in accordance with paragraph 13 of Schedule 7A to the Town and Country Planning Act 1990 to minimise the risk of significant post-permission viability issues arising due to Biodiversity Net Gain issues.

Copyright Warning

Plans, drawing and material submitted to the council are protected by the copyright acts (Section 47, 1988 Act). You may only use the documents listed below for consultation purposes, to compare current applications with previous schemes and to check whether developments have been completed in accordance with approved plans. Copies must not be made without the prior permission of the copyright owner. By viewing the documents listed below you are accepting this copyright.

Please note: Documents held in our archival system may not meet current accessibility requirements. Many of these documents are exempt from these requirements. See Accessible documents at Somerset Council for further information.

35 Documents Found
Filesize:  145.1 MB
Document Type Description Uri RenditionUri Registered Date File Size Extension
26 Documents Found
Filesize:  30.92 MB
Document Type Description Uri RenditionUri Registered Date File Size Extension
19 Documents Found
Filesize:  16.04 MB
Document Type Description Uri RenditionUri Consultee Registered Date File Size Extension
2 Documents Found
Filesize:  37.23 MB
Document Type Description Uri RenditionUri Registered Date File Size Extension
26 Documents Found
Document Type Description Uri RenditionUri Registered Date File Size Extension

Please note: Documents held in our archival system may not meet current accessibility requirements. Many of these documents are exempt from these requirements. See Accessible documents at Somerset Council for further information.

No Committee documents found.